Publications
Assessment of Nuclear Accident-Related Atmospheric Dispersion Methods and Models to Support Establishment of a Scalable Emergency Planning Zone for Small Modular Reactors Electric Power Research Institute EPRI ANT LR 2016-05
​
​
Summary of Research Findings and Gap Assessment of Technical Requirements to Support SMR Emergency Preparedness Framework, Electric Power Research Institute EPRI ANT LR 2016-02
​
​
Integrated Pressurized Water Reactor Emergency Planning Technical Support Roadmap, Electric Power Research Institute EPRI ANT LR 2016-03
​
​
Exploring expert confidence in cost estimates for nuclear power engineering, procurement and construction projects – a survey of nuclear industry experts
Int. J. Strategic Engineering Asset Management, Vol. 1, No. 4, 2013
​
​
Advancing Risk Management in Nuclear Power Plant EPC Projects: An Empirical Evaluation of Risk Management Practices on Steam Generator Replacement Projects
Proceedings of the 7th World Congress on Engineering Asset Management (WCEAM 2012)
Lecture Notes in Mechanical Engineering 2015, pp 545-557
​
​
Improving Construction Cost Learning Curves by Implementing Organizational Learning Tools for Risk Identification and Risk Assessment
Proceedings of the Palisades Conference on Risk Management (2013)
​
​
Advancing Risk Management in Large Infrastructure Projects
Proceedings of the Third International Engineering Systems Symposium Design and Governance in Engineering Systems
​
​
Improving Nuclear Power Plant Construction Learning Curves
Proceedings of the Society for Risk Analysis Annual Conference (2013)
​
​
Improving Cost and Schedule Performance on Large Energy Infrastructure Deployment Projects: Establishment of Best Practices for Risk Management and Organizational Learning in Nuclear Projects Post-Fukushima
University of Pittsburgh School of Law, Energy Institute (2013)
​
​
Advancing Risk Analysis in Nuclear Power Plant EPC Projects
American Society of Mechanical Engineers, Small Modular Reactors Symposium in Washington DC (2011)
​
​
A Novel Objective-based Approach to Nuclear Power Plant EPC Risk Management by Adoption of the Value-Focused Thinking and Mental Model Methods - An Empirical Evaluation with Nuclear Power Plant Projects
American Society of Mechanical Engineers – International Conference on Nuclear Energy, California (2012)
​
​